Merced Yosemite Regional Airport (MYRA) Terminal Replacement Project
![](https://s3-us-west-1.amazonaws.com/ehq-production-us-california/0cf2b17ff02e54dcd6e1d0590422a0dae0da032b/original/1721833680/1a6b1953ef7464cd3d7f272978d2fd99_Proposed_-_looking_southeast.jpg?1721833680)
In December 2023, officials from the City of Merced, Merced Airport Authority, and esteemed representatives, including those from Senator Padilla, Congressman Duarte, State Senator Caballero, and Assemblywoman Soria’s office, joined together with community members to mark the groundbreaking ceremony for the highly anticipated $17 million Merced Yosemite Regional Airport Terminal Replacement Project.
Deputy City Manager, Frank Quintero expressed his enthusiasm for the $17 million project, stating, “Merced Yosemite Regional Airport is our city’s underutilized gem, and this transformative project represents a crucial investment in its future. The updates provided by this project are not just about bricks and mortar; they are about meeting the escalating demands of our growing community, ensuring our airport thrives as a hub for both commercial and private aviation travel. This initiative is a testament to our commitment to unlocking the full potential of our city’s aviation gem for the benefit of all."
The Terminal Replacement Project is designed to address the need for modernization to meet current and future demands by introducing an energy-efficient and sustainable facility. The project includes updates to the existing 5,000 square foot, 1940s-era terminal, which lacks sufficient office space, offers limited room for TSA checkpoint screening, and provides inadequate passenger holding space. The new terminal will include updated passenger holding areas with restrooms, a dedicated TSA area, offices for aviation and airport administration, and upgraded airside services to enhance the overall passenger experience.
Mayor Matthew Serratto expressed gratitude for the project, stating, “I extend appreciation to the FAA for their invaluable support and funding. With Senator Padilla’s steadfast support, we embark on a journey to modernize our airport terminal, a significant step towards enhancing the overall travel experience for our community and visitors alike. This transformative project underscores our commitment to progress and sets the stage for a more vibrant and accessible Merced.”
Merced Yosemite Regional Airport (MCE), a commercial-general aviation airport owned by the City of Merced, serves as a vital link to the community. Currently served by Essential Air Service Provider Advanced Air, a scheduled commuter and private charter airline based in Hawthorne, California, MCE offers daily flights to and from Hawthorne Municipal Airport/Los Angeles and Harry Reid International Airport/Las Vegas.
Approved by the Merced City Council on March 15, 1932, and dedicated on April 3, 1932, MCE has a rich aviation legacy. Leased by the U.S. Army from 1941 to 1945, it became a hub for United Airlines in 1946, continuing until commercial airline deregulation in 1978. Today, MCE relies on the Essential Air Service program to facilitate commercial flights.
This groundbreaking event marked a significant milestone in ensuring the continued growth and success of Merced Yosemite Regional Airport. The City of Merced looks forward to collaborating with all stakeholders to bring this transformative project to fruition.
Concept Photos -
Construction work begins!
Progress Photos - Check back frequently for progress updates.
Progress Photos - April 3rd
This week, contractors installed underground utilities and trenching operations started to accommodate these utilities.
Progress Photos - April 12th
This week, soil was used to backfill the under-slab plumbing in preparation for pouring the concrete slab.
Progress Photos - April 19th
Airside demo work began.
Progress Photos - April 26th
Crews installed rebar and dobie blocks - or concrete spacers.
Progress Photos May 3rd
This week crews made significant progress on the project by pouring the concrete slab. The first half was poured at the beginning of the week, followed by the second half towards the end. Prioritizing quality and durability, crews will wait eight days for the slab to properly cure before moving forward with additional work.
Progress Photos - May 17th
This week, the new terminal building reached a significant milestone as its steel columns were installed, marking the start of vertical construction.
Progress Photos - June 7th
This week marked another milestone in the construction of the new airport terminal. American Crane Rental was on-site to life the large I-Beams into place for the roof. These essential steel columns and I-Beams were manufactured by Southern Valley Steel Inc., based in Bakersfield, CA.
Progress Photos - June 14th
This week, iron workers finished the south rafters. Work continues with welding and HS bolting of the structural steel.
Progress Photos - July 5th
This week, crews installed metal beams for the outer walls.
Progress Photos - July 12th
This week, crews worked on exterior metal stud framing and storm drain installation.
Progress Photos - July 19th
Work continues with the exterior/interior metal stud framing and metal joists. The new storm drains, and valley gutters are partially backfilled.
Progress photos - August 1st
The metal workers are advancing with the stud framing for the building’s exterior and interior. Additionally, work on the fire sprinklers and plumbing systems is underway, with rough-in installations now in progress.
Progress photos - August 16 - Work is underway on the airport terminal replacement project, with crews starting the installation of the exterior plywood walls. This marks an exciting step forward in the development of the new terminal. Stay tuned for more updates as the project progresses.